
Component Removal and Replacement
5. Unplug all 3 connectors from the
board.
6. When installing the new board verify
that the 2 white nylon standoffs (pegs)
(only one shown) are placed into the
slotted sheet metal.
7. After the new board has been installed you will need to re-calibrate all the lens you
have, the cutting table (if applicable), and rotary (if applicable) using the UCP’s
System Tab.
Comentarios a estos manuales