Westerbeke 21A Manual de instalación

Busca en linea o descarga Manual de instalación para Motor Westerbeke 21A. Westerbeke 21A Installation manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir

Indice de contenidos

Pagina 1 - INSTALLATION MANUAL

INSTALLATION MANUALMARINE ENGINES/GENERATORSDIESEL AND GASOLINEPUBLICATION #432682nd Edition May 2004

Pagina 2

ENGINE LOCATIONThe overall layout of the engine room should be planned foreasy inspection, servicing, and handling of the engine.Thoroughly study all

Pagina 3

ENGINE MOUNTINGBronze or stainless steel hanger bolts of appropriate size arerecommended for use through the engine’s flexible mounts.Less preferred a

Pagina 4 - SAFETY INSTRUCTIONS

GENERATOR LOCATIONA solid, level mounting platform is very important for theproper operation of your generator. Select a location that willallow adequ

Pagina 5

There are custom designed sound enclosures for each modelof WESTERBEKE generators. The Sound Guard is a rigid,attractive, easy to clean enclosure that

Pagina 6 - INSTALLATION

The engine/generator is fitted with lifting eyes. Attach wirerope or chain slings capable of supporting the engine/generator's weight to the eyes

Pagina 7 - TABLE OF CONTENTS

PROPELLER SHAFT COUPLING (Engines)A propeller shaft half-coupling is available for all enginemodels. It is bored to shaft size for the specific order,

Pagina 8 - INTRODUCTION

ALIGNMENTThe engine must be exactly aligned with the propeller shaft.No matter what material is used to build a boat, the materialwill be flexible to

Pagina 9

The type and size of propeller varies with the gear ratio andmust be selected to fit the application, based upon boat tests.To utilize the full power

Pagina 10 - ENGINE LOCATION AND MOUNTING

RECOMMENDED GUIDELINESThese guidelines dated February 2004 supercede all previous guidelines published by Westerbeke Corporation for all types of exha

Pagina 11

This leads to B, the amount by which the spill over point ofthe exhaust outlet is above the worst case water level. Bshould be maximized (and certainl

Pagina 12 - ▲ WARNING:

CALIFORNIAPROPOSITION 65 WARNINGDiesel engine exhaust and some ofits constituents are known to theState of California to cause cancer,birth defects, a

Pagina 13 - SOUND ENCLOSURE

Sea water Intrusion Through The Intake SeacockAnother means of water intrusion is though the sea waterintake seacock. This can occur when any part of

Pagina 14

Check ValvesVarious types of check valves are available and suitable forexhaust runs. Examples are in-line check valves offered bysome exhaust compone

Pagina 15 - PROPELLER SHAFT ALIGNMENT

Exhaust Back Pressure (cont.)Back pressure should not exceed 1.5 psi or 41” WC.Excessive back pressure can be reduced by increasing E,increasing the s

Pagina 16

EXHAUST ELBOW INSTALLATIONExhaust elbows are standard on generators, optional onengines. For installation on your engine/generator, we offer450,700and

Pagina 17 - PROPELLER SELECTION

EXHAUST SYSTEM PRECAUTIONSCarbon MonoxideThe best protection against carbon monoxide poisoning is adaily inspection of the complete exhaust system. Ch

Pagina 18 - EXHAUST SYSTEM INSTALLATION

DC ELECTRICAL CONNECTIONSWESTERBEKE engines and generators are supplied pre-wired and with plug-in connectors. Never make or breakconnections while th

Pagina 19

CONTROL WIRINGFor control wiring, see the DC WIRE SIZING page in thismanual.NOTE: All wiring should be tied down with clamps or plasticties, and space

Pagina 20

21ELECTRICAL SYSTEM▲ WARNING:An improper ground can cause severepersonal injury or death from fire or explosion. Be sureto install a common ground con

Pagina 21

DESCRIPTIONThis manually-operated control panel is equipped with aKEY switch and RPM gauge with an ELAPSED TIMEmeter which measures the engine’s runni

Pagina 22

DESCRIPTIONThis manually-operated control panel is equipped with aKEY switch, an RPM gauge, PREHEAT and START but-tons, an INSTRUMENT TEST button and

Pagina 23 - ▲ CAUTION:

INTRODUCTIONRead this safety manual carefully. Most accidents are causedby failure to follow fundamental rules and precautions.Know when dangerous con

Pagina 24

FUEL TANKS—GENERALIt is very important that the design, construction and installation of all fuel system components meet the highestpossible standards

Pagina 25 - ELECTRICAL SYSTEM

This shutoff valve is necessary to guard against the possibil-ity of gasoline siphoning through the supply line to the car-buretor and into the engine

Pagina 26

DUAL PURPOSE FUEL TANKIf you’re running both a generator and a propulsion engineand they use the same fuel, you can use the same fuel tank.However, be

Pagina 27

FUELTo insure satisfactory operation, an engine or generator musthave a dependable supply of clean fuel.Diesel Fuel – use No. 2 oil with a cetane rati

Pagina 28 - ADMIRAL CONTROL PANEL

RAW WATER INTAKERaw water should be supplied to the raw water pumpthrough a standard-type through-hull fitting, located on thehull so as to be below t

Pagina 29 - CAPTAIN CONTROL PANEL

COOLANT RECOVERY TANKA coolant recovery tank kit is supplied with each WESTERBEKE engine/generator. The purpose of this recovery tank is to allow for

Pagina 30

OIL SPECIFICATIONSRefer to your Westerbeke Operator’s Manual for the oil specifications for your engine/generator.OIL DRAIN HOSEAn oil sump drain hose

Pagina 31 - FUEL TANKS/ FUEL SYSTEM

INSTALLATIONThis popular accessory is used to relocate the engine’s oil filter from the engine to a more convenient location such asan engine room bul

Pagina 32

The ventilation requirements of the engine or generatorinclude the following: combustion air is required for theengine’s cylinders, and cooling air is

Pagina 33

33WATER HEATER CONNECTIONSREMOTE EXPANSION TANKThe pressure cap on the engine’s manifold should beinstalled after the engine’s cooling system is fille

Pagina 34

ACCIDENTAL STARTING Disconnect the battery cables before servicing the engine/generator. Remove the negative lead first and reconnectit last. Make c

Pagina 35 - COOLING SYSTEM

SHIPMENTFor safety reasons, the transmission is not filled with transmission fluid during shipment and the selector lever istemporarily attached to th

Pagina 36 - ENGINE OIL

BORG WARNER VELVET DRIVECheck the transmission fluid level on the dipstick. If thetransmission has not been filled, fill with Dextron III andcontinue

Pagina 37 - REMOTE OIL FILTER

36FINAL INSTALLATION CHECKSNOTE: Also refer to PREPARATIONS FOR INITIAL START-UP in your Operator’s Manual.Before starting the engine or generator com

Pagina 38

37ENGLISH TO METRIC CONVERSION CHART

Pagina 40 - WWW.ZF-MARINE.COM

39DECIMAL TO METRIC EQUIVALENT CHART

Pagina 42 - FINAL INSTALLATION CHECKS

Do not wear loose clothing or jewelry when servicingequipment; avoid wearing loose jackets, shirts, sleeves,rings, necklaces or bracelets that could

Pagina 43

When installing WESTERBEKE engines and generators it is important that strictattention be paid to the following information:CODES AND REGULATIONSStric

Pagina 44 - WIRE SIZING

TABLE OF CONTENTS1Introduction...2Installation Codes and Safety Standards...

Pagina 45

This marine Installation Manual covers all WESTERBEKEEngine and Generator models, both diesel and gasoline. Thepurpose of this manual is to provide bo

Pagina 46 - 604WMDW1082

PRODUCT SOFTWAREProduct software, (tech data, parts lists, manuals, brochuresand catalogs) provided from sources other than WESTERBEKE are not within

Comentarios a estos manuales

Sin comentarios