Westerbeke 21A Manual de instalación Pagina 42

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 46
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 41
36
FINAL INSTALLATION CHECKS
NOTE: Also refer to PREPARATIONS FOR INITIAL START-UP in your Operators Manual.
Before starting the engine or generator complete the follow-
ing checklist:
Is there fuel in the tanks and are the fuel valves open?
Has lube oil been added to the engine?
Is there transmission fluid in the transmission?
Has the proper coolant mix been added?
Are the battery cables properly connected?
Is the exhaust system secure and all connections tight?
Is the transmission linkage positioned correctly? Is the
gear in Neutral?
Is the raw water petcock open? Is the raw water pump
primed?
Are the AC and load connection wires securely
connected to the circuit breaker?
With the engine or generator running, check the following:
Make certain that water is flowing from the exhaust.
Check the instrument gauges for proper readings.
Inspect the engine for fuel, water, coolant, and oil
leaks.
Listen for unusual sounds and vibrations.
Will the engine shift in and out of gear?
Can you throttle up to the recommended rpm’s? Is the
throttle action smooth?
Apply a load to the generator; check the output fre-
quency.
NOTE: See your operators manual for the output
adjustment.
After shutdown, check the engine or generator carefully.
inspect all fluid levels, check hose clamps, fuel lines, etc.
Vista de pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46

Comentarios a estos manuales

Sin comentarios