Westerbeke 15.0KW -60Hz EDT Manual del operador Pagina 88

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 100
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 87
Batteries
II batteries
are
to
be left on board during the lay-up period, ensure
lha!
they are and will remain
that way,
to
prevent them from freezing.
il
there exists any doubt Ihat the batteries will not remain lully
charged,
or
that they will
be
subjected
10
severe environmental conditions, remove the batteries and store
them
in
a warmer, more compatible environment
Recommissioning
The recommissioning of your Westerbeke unit after a seasonal lay-up generally follows the same proce-
dures
as
those presented
In
the "PREPARATIONS
FOR
STARTING"
section, page 35, regarding preparation
for starting and normai starts. However, some
01
the lay-up procedures will need
to
be
counteracted before
starting the engine.
1.
Remove the oil-soaked cloths lrom the intake manifold and from the through-hull exhaust port.
2. Remove the sea water pump cover and gasket. Discard the gasket. Install the sea water pump impeller
removed during lay-up (or a replacement, if required). Instalilhe sea waler pump cover with a new cover
gasket.
iWARNINGI
Wear rubber gloves, a rubber apron, and eye protection when servicing batteries.
Lead
acid batteries emit hydrogen, a highly-explosive gas, which can be ignited
by
electrical
arcing
or
a lighted cigarette, cigar,
or
pipe. Do not smoke
or
allow an open flame near the
battery being serviced.
Shut off
all
electrical equipment in the vicinity
to
prevent electrical ar-
cing during servicing.
3.
Reinstall the batteries that were removed during the lay-up, and reconnect the battery cables, making
sure the terminals
are clean and that the connections are tight. Check
to
ensure that the batteries are
fully-charged.
4.
Check the condition of the zinc anode in the sea water circuit and clean
or
replace the anode as needed.
Note that it is not necessary
to
flush the antifreeze/fresh water solution from the sea water coolant sys-
tem. When the unit
is
put into operation, the system will self-flush in a short period
01
time wtth no ad-
verse affects.
5.
Start the unit in accordance with those procedures found in the "STARTING PROCEDURES" section of
this manual, page
36.
Westerbeke Generators
!l4
Vista de pagina 87
1 2 ... 83 84 85 86 87 88 89 90 91 92 93 ... 99 100

Comentarios a estos manuales

Sin comentarios