Rigging and
lilting
The generator
is
fitted with lifting eyes. Rope or chain slings capable of supporting the generator's weight
should be attached
to
the eyes and the generator lifted by means of tackle attached to these slings. The lift-
ing eyes have been designed
to
carry the full weight
of
the generator; therefore, auxiliary slings are not
re-
quired
or
desired.
CAUTION
Slings
must
not
be so short
as
to place significant stress on the generator's lifting eyes. Strain
placed on the generator's lifting eyes
by
the lifting sling must no! be in excess
of
10'
from the
vertical plain.
ENGINE
SLING LIFTING
ANGLE
to4USI
NOT
EXCEED
10'
LIFTING
EYE
The general rule in moving generators
is
to
see that all equipment used is amply strong and firmly fixed
in
place. Move the engine a little at a time and
see
that it
is
firmly supported. Eliminate the possibility
of
acci-
dents
by
avoiding haste. Do not lift the generator by its crankshaft pulley. In certain situations
it
may be
necessary
to
lift the engine in positions other than the horizontal position. Certain situations exist by which
the engine must be
lowered endwise through a small hatchway which cannot be made larger. Under these
conditions, if the opening of the hatchway
is
extremely small,
tt
is
possible to reduce, to some extent, the
outside dimensions of the generator by removing external components such as the cooling system's piping,
the heat exchanger, certain filters, the mounting rails and other obstructive equipment. This accessory
equip-
ment should be removed by a competent mechanic and special care should be taken
to
avoid damage to
any exposed parts.
In addition, be careful not to allow dirt from entering any opening created by the removal
of
equipment. Removed parts should be returned to their respective position
as
soon
as
the generator has
cleared the obstruction and
is
ready to be positioned on
tts
mounting platform.
In case it becomes necessary
to
hoist the generator front-end upwards
or
generator-end upwards, the at-
tachment
of
lifting slings must be done carefully
to
avoid the possibility of damaging the parts on which the
weight
of
the slings may bear. Special rigging work
is
best done by someone experienced and competent
in handling heavy machinery.